The frontier partitions all charge-relevant items for a project into three buckets:
- Runnable -- items with no unsatisfied activation-gate hard-block dependencies, not frozen, ranked by priority.
- Blocked -- items with at least one unsatisfied activation-gate hard-block dependency. Each carries human-readable reasons.
- Frozen -- items with
frozen = 1, excluded from the active frontier entirely.
A WIP cap limits how many conduct-eligible items are returned, preventing overcommitment.
Algorithm
The compute_frontier() function exported by yoke_core.domain.frontier and implemented in yoke_core.domain.frontier_compute owns the full computation:
Step 1: Fetch candidate items
Query the charge-relevant status subset for the target project. The candidate set includes refine, shepherd, conduct, polish, and usher handoff states plus items where items.blocked = 1. Only done, cancelled, stopped, and failed are excluded from the frontier.
Step 2: Resolve hard-block dependencies
Query the item_dependencies table for all canonical blocker dependencies at gate_point='activation'. Evaluate each dependency using its satisfaction condition (status:<stage-id>, fact:merged, or fact:deployed:<environment-name>) and build a map from each dependent item to its list of unsatisfied blockers. Use the blocker's pinned workflow stage, normally status:done when completion is all the dependent needs. Use fact:merged for a completed blocker or a needed landing after the edge is created; a blocker at done always satisfies it, while an unfinished blocker needs a recorded landing strictly after edge creation. See merge-wait semantics. Reserve fact:deployed:<environment-name> for a dependent requiring completion plus delivery to that registered environment. It consumes the completed item's persisted run/member/environment/candidate attribution in its delivery stamp. Later sibling failure or run cancellation cannot revoke it. Producer QA, approval and completion gates still apply before done; accepted QA alone is not delivery.
Step 2b: Hold committed work waiting only to land
An item with no unsatisfied activation blocker, whose active implementation
lane has a recorded commit (item_worktrees.commit_sha), and whose only unmet
edges are at integration, waits instead of being runnable: building is done
and landing is what those edges hold back. Its reason is one sentence naming
each blocker by condition, for example Waiting on PREFIX-1, PREFIX-2 to merge (frontier_landing_wait).
Step 3: Compute direct activation unblocking value
For each item, count how many other items it blocks at the activation gate.
This remains a useful tiebreaker within the same downstream depth, but
integration and closure edges do not influence frontier start-order ranking.
Step 3b: Compute downstream activation depth
Traverse the activation-gate dependency graph and compute each item's maximum downstream depth (longest blocker-to-dependent chain). This captures critical-path leverage: the head of a deep enabling chain should rank above a broader but shallower fan-out when priority is equal.
Step 4: Count current WIP
Count items in implementing or reviewing-implementation status for the project (excluding frozen items). These are the statuses that consume implementation WIP. reviewed-implementation and polishing-implementation are finishing-review states and do not consume conduct WIP slots.
Step 5: Resolve the registered skill
Each item loads its immutable workflow_id / workflow_version_id pin. The
runtime finds the current stage in that definition and resolves the registered
skill binding for the stage. The frontier adapter remains a coarse ranking
category; scheduler next_step is the skill binding and is the dispatch
truth.
Items with unsatisfied activation-gate hard-block dependencies are reclassified to wait regardless of their status-based adapter. Items with items.blocked = 1 are also reported in the blocked bucket even when they do not have a hard-block dependency row.
Step 6: Partition and rank
- Frozen items go to the frozen bucket (separate reporting).
- Blocked items (activation-gate hard-block dependencies unsatisfied or
items.blocked = 1) go to the blocked bucket with their blocker list and human-readable reasons. - Runnable items are sorted by the deterministic ranking algorithm (see below).
Step 7: Enforce WIP cap
The WIP cap limits remaining implementation capacity. In practice, scheduler suppression applies to epic conduct work; issue implement re-entry remains schedulable, but items already in implementing or reviewing-implementation still contribute to wip_active.
Ranking Algorithm
Runnable items are sorted by five criteria in descending priority:
- Priority --
high>medium>low. - Downstream depth -- items at the head of longer activation-gate chains rank higher.
- Direct activation unblocking value -- within the same depth, items that directly unblock more activation-gate dependents rank higher.
- Lifecycle stage -- items closer to
donerank higher (prefer finishing over starting). - Item age -- older items rank higher (FIFO tiebreaker via ISO 8601
created_at).
The sort is stable and deterministic: identical DB state always produces identical ordering.
Data Models
FrontierItem
@dataclass
class FrontierItem:
item_id: int # internal items.id (scheduler-internal currency)
title: str
status: str # canonical status
priority: str # high, medium, low
project: str
workflow_id: str
workflow_version_id: int
adapter: AdapterCategory # refine, shepherd, conduct, implement, dash, blitz, polish, usher, wait, skip
blocked_by: List[str] # public text refs stored on item_dependencies rows
blocked_reasons: List[str] # human-readable reasons
unblocks_count: int # direct activation-gate dependents
downstream_depth: int # longest downstream activation chain
created_at: str # ISO 8601
The in-process dataclass carries the internal items.id. Every serialized
surface (REST endpoints, service-client JSON, scheduler payloads)
renders item_id as the item's TRUE public ref
({projects.public_item_prefix}-{items.project_sequence} — the prefix is
per-project, so the same shape renders EXT-12 in one project and
PLAT-12 in another) — the sequence and prefix may diverge from the
internal id. A surface rendering one ref calls
project_identity.render_item_ref; a surface rendering a set of them
resolves the whole set first through item_ref_render.render_item_refs,
so a frontier projection costs one identity read rather than one per item.
FrontierResult
@dataclass
class FrontierResult:
runnable: List[FrontierItem] # ranked by priority
blocked: List[FrontierItem] # have unsatisfied hard-blocks
frozen: List[FrontierItem] # excluded (frozen=1)
wip_cap: int # configured WIP limit
wip_active: int # current WIP count
conduct_eligible: List[FrontierItem] # runnable conduct items within WIP cap
AdapterCategory
class AdapterCategory(str, Enum):
REFINE = "refine" # item needs refinement (idea, refining-idea, plan-drafted, refining-plan)
SHEPHERD = "shepherd" # item needs maturation (refined-idea epic, planning epic)
CONDUCT = "conduct" # item ready for implementation
POLISH = "polish" # item reviewed, needs finishing review (reviewed-implementation, polishing-implementation)
USHER = "usher" # item ready for deployment
WAIT = "wait" # item blocked or exceptional
SKIP = "skip" # item terminal, not actionable